Free site visit · Written quote within 3 working days Let’s plan it
Finished terrace rear extension with a dining table and garden doors

KITCHEN & REAR EXTENSIONS IN MELAKA

A little more space.
A lot more possibility.

A proper wet kitchen, a room to gather or space to work. We plan the structure, roof and drainage as carefully as the finish.

Planning rangeRM 35,000–95,000
Typical work on site8–12 weeks
Before you commitMeasured, written quote

START WITH THE RIGHT DETAILS

The finish depends on the work underneath.

Check before we build

We inspect the existing structure and confirm when engineering input is required.

Approvals planned in

We handle council permit coordination for structural work, with fees and responsibilities written down.

Old and new, joined properly

Roof connections, wall joints and drainage get attention from the start.

YOUR WRITTEN SCOPE

Here is what we plan with you.

  • Site measurement and access review
  • Council submission coordination for structural work
  • Structural, roof and drainage works as specified
  • Agreed walls, floor finishes and service points
  • Water-tightness checks and final walkthrough

Appliances, loose furniture, hidden damage and management fees are priced separately unless listed in your quotation. Changes need your written approval.

See the full price guide
Structural work at the rear extension of a terrace home

RECENT WORK

Room for a proper wet kitchen

Cheng · 9 weeks · RM 52,000–60,000

The detail that mattered

The wet kitchen gained usable space without cutting off the rear airflow. The roof junction and rainwater route were planned before the structure went up.

WHAT HAPPENS NEXT

An order to the work.

01

Stage 1

Site & structural checks

We check the space and agree the scope before committing dates.

02

Stage 2

Drawings, approvals & material planning

Your supervisor coordinates this stage and sends progress photos.

03

Stage 3

Foundations, structure & roof

We inspect the work together before moving on.

04

Stage 4

Services, finishes & tests

We inspect the work together before moving on.

05

Stage 5

Inspection & handover

We inspect the work together before moving on.

BEFORE YOU START

A few useful answers.

Discuss your space
Do I need council approval?+

Structural extensions usually require approval. The exact requirements depend on the property and local authority. We confirm the route before structural work starts.

Is the approval time inside the build time?+

The construction range starts once the necessary approvals and materials are ready. Submission and review periods are shown separately in your plan.

Will an extension affect light and ventilation?+

It can. We discuss openings, air movement, rain protection and the remaining outdoor space before settling the layout.

LET’S MAKE ROOM FOR BETTER

Tell us what you
want to change.

We will visit, measure and send a written quote in 3 working days.

No obligation. No pressure to decide on the day.

WhatsAppFree site visit

A CLOSER LOOK

From old kitchen to everyday favourite.

Read the full project