Stage 1
Ayer Keroh / Terrace house · 1,800 sq ft
Made for everyday family life.

The brief
A home that fits
the way they live.
Three generations wanted to stay in the house they loved, with better cooking space, easy storage and less clutter.
“We wanted it to feel calm, but we still needed somewhere to put everything. And we needed to know the cost before we started.”
Ground floor renovation, wet and dry kitchens, carpentry, plumbing and lighting. We agreed the scope, budget and finish date before site work began.
Where we began
First, we understood the space.


Before work: we measured, checked services and discussed what could be kept.
The plan
Keep the flow.
Make room for daily life.
Wet areas stayed close to existing plumbing. Built-in storage leaves clearer walking routes.
Concept layout, not to scale. Construction drawings follow the site measure.
The idea, brought to life
A closer look
at the details.
The lighting, joinery and finishes work together to make the space feel considered.




Room by room
Small decisions.
A home that works as a whole.
Living
Storage stays close to where it is used, leaving the centre of the room open.


Kitchen
The finishes carry through, with a little variation in texture and light.


Bedroom
Easy-clean surfaces, task lighting and room for the things used every day.


Details
A softer palette and useful storage make a quiet place to end the day.



The material story
Warm to look at.
Practical to live with.
We chose finishes in natural light, then checked them at home. Low-maintenance laminate handles daily use, quartz gives a practical work surface, and timber details add warmth.
The programme
14 weeks. One shared plan.
Weekly updates covered what was done, what came next and any decisions needed from the family.
Stage 2
Services, protection and preparation
Stage 3
Workshop production and site work
Stage 4
Installation, checks and handover
These stages overlap across the agreed 14 weeks programme. We confirm a detailed schedule after design approval.
The numbers, openly
What went into
the budget.
These costs reflect this property’s scope and materials. Your quote follows your own site measure.

At home, at last
“We knew what each payment was for. When we added the laundry cabinet, they wrote down the extra cost before making it.”
Farid / Ayer Keroh · Terrace renovation
Your home, thoughtfully considered
Tell us about your home.
We will help you plan the first step.
45 minutes. A rough budget range. A clearer way forward. No obligation.


