Finished L-shaped Bukit Katil kitchen with oak and cream cabinets

PROJECT STORY · BUKIT KATIL

Storage for a
growing family.

A double-storey terrace kitchen, reorganised for school mornings, family meals and everything that needs a home.

PropertyDouble-storey terrace
Time on site5 weeks
Final cost rangeRM 31,000–35,000
Site supervisorHafiz Rahman

THE STARTING POINT

What the family
needed to change.

The kitchen was still usable, but the family had outgrown its storage. Pots were stacked behind one another, everyday items crowded the worktop, and the corner cupboards were hard to reach. They wanted more useful space within the existing room.

The brief we agreed

  • Keep the existing room footprint and L-shaped layout
  • Give pots, crockery and pantry items their own places
  • Free up a clear food-preparation surface
  • Use finishes that are easy to wipe after daily cooking

BEFORE & AFTER

Same viewpoint.
A better everyday.

Drag the line to compare the room before and after the agreed renovation.

After renovation: Bukit KatilBefore renovation: Bukit KatilBeforeAfter↔

Bukit Katil

Double-storey terrace · 5 weeks · RM 31,000–35,000

WHAT WE DID

The decisions behind the result.

Store by everyday use

Deep drawers put heavy pots within reach. Everyday crockery sits close to the preparation and washing areas.

Use the full height

Full-height upper storage gives less-used items a place without taking over the worktop.

Keep services practical

The sink and hob stayed in their established zones. The team checked and renewed the agreed service points before the cabinets went in.

THE AGREED WORK

A scope you can
follow room by room.

  • Measured cabinet layout and a storage plan agreed with the family
  • Removal of the old cabinets and agreed worn finishes
  • Plywood cabinetry with laminate doors and drawer fittings
  • Quartz worktop, sink connection and agreed tiling
  • Plumbing and electrical adjustments listed in the quotation
  • Testing, final cleaning and a joint defects walkthrough

Loose appliances and furniture were outside this scope. Any additional hidden repairs needed a written price and approval before proceeding.

Laminated plywood boards with visible layered edges

Chosen before ordering

The family confirmed cabinet finishes, worktop choices, fitting measurements and the listed hardware before fabrication began.

THE WORK, IN ORDER

A schedule the family could plan around.

Material choices and cabinet lead times were confirmed before the on-site period began.

01

Week 1

Protect & remove

Screen the work area, protect the access route and remove the agreed cabinets and finishes.

02

Week 2

Services & tiling

Finish the agreed plumbing and wiring points, prepare the walls and complete the specified tile work.

03

Week 3

Cabinets into place

Install the measured cabinets, check levels and confirm the worktop dimensions.

04

Week 4

Worktop & fittings

Fit the quartz worktop, connect the sink and complete the agreed lighting and hardware.

05

Week 5

Check & hand over

Test drawers, doors, water flow and lighting with the family. Clean the room and close the agreed touch-ups.

Site supervisors and crew reviewing renovation work

HOW THE JOB STAYED ON TRACK

One supervisor.
A clear daily update.

Hafiz confirmed the cabinet layout and the family’s storage priorities before ordering. During site work, his daily photo updates showed which trades had finished and what would happen next.

  • Agreed work and payment milestones in writing
  • Changes discussed before extra work began
  • Photos and the next day’s plan shared on WhatsApp
  • Joint checks and touch-ups before the last payment

The family selected their sink before the cabinet drawings were finalised. That kept the worktop opening and under-sink storage clear, with fewer decisions left until installation day.

WHERE THE BUDGET WENT

A cost you can
make sense of.

These work groups made up the final agreed scope. Exact materials, quantities and exclusions were listed in the written quotation.

Final project range: RM 31,000–35,000. The agreed work total below sat within that range. The final 5% was held until the agreed handover defects were closed.

Protection, cabinet removal & waste disposalRM 2,400
Wet works & agreed tile workRM 4,800
Cabinets, drawers & storage fittingsRM 15,800
Quartz worktop & installationRM 4,200
Plumbing & electrical adjustmentsRM 4,200
Finishing, testing & final cleanRM 1,600
Agreed project totalRM 33,000

WHAT CHANGED FOR THE FAMILY

Useful on the inside.
Calm on the outside.

Warm oak lower cabinets and cream upper doors keep the room light. The practical gain comes from the drawer layout, cabinet height and clear worktop, rather than adding more floor area.

  • A clear preparation area beside the sink
  • Daily-use storage that is easier to reach
  • The existing kitchen footprint put to better use
Plan a similar kitchen
Finished Bukit Katil kitchen with the agreed cabinets and worktop
★★★★★
“We used to move three things just to get one pot out. Hafiz asked what we used every day before the cabinet plan was final. The drawers make a real difference, and the kitchen was ready in the five weeks agreed.”
Farah

Bukit Katil · Kitchen renovation

LET’S MAKE ROOM FOR BETTER

Tell us what you
want to change.

We will visit, measure and send a written quote in 3 working days.

No obligation. No pressure to decide on the day.

WhatsAppFree site visit

A CLOSER LOOK

From old kitchen to everyday favourite.

Read the full project