BATU BERENDAM, MELAKA · MALAYSIADemo by Web Consult SMB · How it was planned
Gloved hands handling a component tray at a packaging workstation

HomeApplications

Applications

Fabless semiconductor devices.

Move an IC design into a packaged, electrically verified pilot lot.

APPLICATION BRIEF

What your team should prepare.

01

Confirm package fit

Bring the die drawing, pad layout, package outline and key material requirements.

02

Plan assembly and test together

Agree who owns the assembly drawing, electrical limits, golden units and test fixtures.

03

Define the pilot release

Confirm sample quantities and the build, inspection and test records needed before repeat production.

ILLUSTRATIVE PROJECT

See how a team handled a similar build.

Browse all applications