CASE STUDY
Transferring final test with less uncertainty
A handover plan for test coverage, correlation and lot disposition.
Read case study
HomeApplications
Applications
Move an IC design into a packaged, electrically verified pilot lot.
APPLICATION BRIEF
Bring the die drawing, pad layout, package outline and key material requirements.
Agree who owns the assembly drawing, electrical limits, golden units and test fixtures.
Confirm sample quantities and the build, inspection and test records needed before repeat production.
ILLUSTRATIVE PROJECT
CASE STUDY
A handover plan for test coverage, correlation and lot disposition.
Read case study