FABLESS SEMICONDUCTORS
Fabless semiconductor devices
Move an IC design into a packaged, electrically verified pilot lot.
Explore application
SEMICONDUCTOR ASSEMBLY & TEST · MELAKA
Semiconductor assembly, final test and electronics manufacturing for teams moving from engineering samples to repeat production.

01 / THE MANUFACTURING FLOORABOUT NUSACORE
Moving a device into production takes more than finding an available line. You need to know who will review the package, how test readiness is checked and what records you’ll receive at release.

WHAT WE DO
Start with the stage you need. Each capability page shows what to share, what gets reviewed and what happens next.
See all capabilitiesAPPLICATIONS
Explore common project paths for semiconductor devices, industrial control electronics and instrumentation.
FABLESS SEMICONDUCTORS
Move an IC design into a packaged, electrically verified pilot lot.
Explore applicationINDUSTRIAL ELECTRONICS
Prepare a control or interface board for a traceable first build and repeat orders.
Explore applicationSENSORS & MEASUREMENT
Agree how a packaged sensing device will be assembled, tested and sorted.
Explore applicationSELECTED CASE STUDIES
Three fictional project examples for engineering and procurement teams.

QUALITY & TRACEABILITY
Follow an example production record from incoming material through inspection, hold decisions and release. See what a buyer can ask to review at each stage.
Explore the quality processENGINEERING RESOURCES
PROCUREMENT
Package, volume, target dates and the information that makes the first review easier.
Read guideENGINEERING
The checks to agree before a test program moves to a new site.
Read guideQUALITY
The production records a buyer may ask to see when investigating a lot.
Read guideSTART A CONVERSATION
Share your package or board type, expected volume and target date. That gives engineering a clear place to start.