What to include in a semiconductor RFQ.

Package, volume, target dates and the information that makes the first review easier.

PROCUREMENT

What to prepare.

01

Start with the scope

Say whether you need assembly, final test, both, or electronics manufacturing. Include the package or board type and the project stage.

02

Put numbers against demand

Separate sample quantity, pilot quantity and expected annual volume. Include a target date for each stage if you have one.

03

Show which inputs are ready

List the drawings, material specifications and test requirements you have. Flag any that are still being developed.

04

Agree how to share files

If drawings or test programs are confidential, ask about an NDA and a secure handover route first.

START A CONVERSATION

Tell us what you’re building.

Share your package or board type, expected volume and target date. That gives engineering a clear place to start.