BATU BERENDAM, MELAKA · MALAYSIADemo by Web Consult SMB · How it was planned
A quality engineer examining a component under a microscope

HomeQuality

Quality

Quality you can review.

Follow the checks, decisions and records that connect incoming material to a released lot.

LOT TRACEABILITY

Follow a lot through the floor.

01

Incoming materials

Link the incoming material lot and inspection status to the work order.

02

In-process checks

Record the approved revision and the inspection points used during the build.

03

Final verification

Review the required results, exceptions and held material before release.

04

Release and handover

Link released quantities to the lot and its agreed quality records.

A technician scanning the label on a semiconductor tray

ILLUSTRATIVE RELEASE PACK

  • Lot identification and revision history
  • Inspection and test summary
  • Hold or rework disposition, when applicable
  • Release approval and shipped quantity
Download sample lot record

BUYER QUESTIONS

What to confirm early.

Can buyers review a sample lot record?

Yes. The example above shows the kinds of fields a buyer could ask to review. It contains fictional data.

Can quality requirements be discussed before quoting?

Include the applicable acceptance criteria, record-retention needs and customer-specific requirements in the RFQ. Engineering can use those inputs to define the review scope.

How are held lots handled?

The illustrated process records the reason for a hold and identifies who is authorised to approve the disposition before release.

START A CONVERSATION

Tell us what you’re building.

Share your package or board type, expected volume and target date. That gives engineering a clear place to start.

Request a quote